MDOT Metro Detroit weekend construction schedule for 06/09-06/12/17


DETROIT, MI – Weekend construction schedule for 06/09-06/12/17. All construction is weather dependent. (Only some of new weekend construction is listed, in addition to projects already in place.) Please always check Michigan.gov/drive or MiDrive app for all projects affecting your route.

MDOT weekend only, 06/09-06/12/17, in addition to other on-going work.




Construction is weather dependent. Always check MiDrive app, Michigan.gov/drive and Twitter for current information.

***M-10 COMPLETE CLOSURE BTW I-94 AND I-75 for MLK bridge demolition.

– SB closing Fri 9 AM (yes, am) thru Mon am

— NB closing Fri 7pm thru Mon am

 

Coolidge:

Oakland – NB/SB Coolidge, Leeland St to Square Lake, 1 lane open Sat 7 AM-Sun 7 PM.

Grand River:

Oakland – SB Halstead Rd at Grand River, 1 lane open nightly, Sat 8 PM-Fri 5 AM.

Oakland – EB/WB Grand River, Farmington Rd to Grove, CLOSURE Fri 9 PM-Mon 5 AM.

Oakland – WB Grand River at 10 Mile, 1 lane open nightly Mon 8 PM-Sun 5 AM.

Oakland – NB Freedom Rd at Grand River, 1 lane open nightly, Sat 8 PM-Fri 5 AM.

Oakland – EB/WB Grand River, Sinacola to Colgate, lane closures on side streets, Mon-Sun 9 AM-3 PM.

Oakland – EB/WB Grand River, Sinocola St to Shiawassee. 1 lane open nightly, Sat 8 PM-Fri 5 AM.

I-696:

Oakland – WB I-696 ramp to NB/SB I-75, ramp closed Thu 9 PM-Fri. 5 AM.

Oakland – EB I-696 at Bermuda, 2 right lanes open, 2 left closed, Sat 8 AM-2 PM.

Oakland – Adams Rd under I-75, Adams closed, Sat 6 AM-2 PM.

I-75:

Wayne – SB I-75 at NB M-10: Interchange ramp close from Fri. 7 PM to Mon. 5 AM.

Wayne – WB I-96, Local Lanes, at M-39. One lane open, Mon 9 AM-Tue 3 PM.

I-94:

Macomb – EB /WB 26 Mile at I-94. 1 lane open, 1 lane closed, daily Mon-Fri 9am-3pm till 6/23.

Macomb – NB /SB M-29 at I-94, 1 lane open, 1 lane closed, daily Mon-Fri 9 AM-3 PM till 6/23.

Macomb – NB and SB M-3 at WB I-94: One lane open, one lane closed from Mon. 9 AM to Mon. 3 PM.

Wayne – WB I-94 ramp to SB M-10, ramp closed, Fri 9 AM-Mon 5 AM.

Wayne – Vernier (M-102) ramp to WB I-94, ramp closed, Mon 9 AM-Wed 3 PM.

Wayne – EB/WB I-94, Conner to M-102 (Vernier), 1 right lane closed, Mon 9 AM-Wed 3 PM.

Wayne – M-3 (Gratiot) ramp to WB I-94, ramp closed, Mon 9 AM-Wed 3 PM.

Wayne – EB I-94 ramp to SB M-10, ramp closed, Fri 9 AM-Mon 5 AM.

Wayne – EB I-94 exit to Harper, ramp closed, Mon 9 AM-Wed 3 PM.

Wayne – EB I-94 at I-96, 1 lane closed, Mon 9 AM-3 PM.

Wayne – Lucky Place St ramp to WB I-94, ramp closed, Mon 9 AM-Wed 3 PM.

M-1: (Woodward)

Oakland – NB/SB M-1, 14 Mile to 13 Mile, right lane closed, Mon 7 AM-Thu 7 AM.

M-10: (Lodge)

Wayne – NB/SB M-10 CLOSED btw I-94 and I-75, incl all entrance/exit ramps.

-SB M-10 closure, Fri 9am-Mon 5am.

-NB M-10 closure, Fri 7pm-Mon 5am.

-Ramp closures: Grand River, Warren, Webb, Calvert, Chicago, Howard/Abbott, Forest, Bagley

M-15:

Oakland – NB Dixie Hwy at M-15, 1 lane open, Mon 9 AM-3 PM.

M-3: (Gratiot)

Wayne – NB/SB M-3, Conner St. to McNichols, 1 lane open, Mon 7 AM-11 AM.

M-39: (Southfield)

Wayne – SB M-39 near Warren Ave, right lane closed, Fri 9 AM-Fri 3 PM.

Wayne – NB M-39 near Warren Ave, right lane closed, Mon 9 AM-3 PM.

M-5:

Oakland – NB/SB M-5 at Maple Rd, M-5 CLOSING for 15-minute, Sat 7 AM-9 AM for utilities.

Oakland – SB M-5 exit to Grand River, 1 lane open overnight, Sat 8 PM-Fri 5 AM.

M-59:

Oakland – EB M-59, Williams Lake to Airport, 1 lane open, center turn lane only, nightly, Mon 12 AM-Sun 11PM.

US-24:

Wayne – NB US-24 service drive over I-96, 1 lane open, Sun 8 AM-5 PM.

Loading Disqus Comments ...
Loading Facebook Comments ...