MDOT weekend construction schedule for 08/11-08/14/17


LANSING, MI – The following is the current MDOT weekend construction schedule for 08/11-08/14/17, (weather dependent), in addition to other projects.

Always check MiDrive app, Michigan.gov/drive and Twitter for current information.




I-75:

Oakland – NB I-75 ramps to EB/WB Big Beaver, ramps closed Fri 10p-Sun 10a AND EB Big Beaver ramp to SB 75 closed.

Wayne – SB I-75 at West Rd, right lane closed Sat 6a-10a AND SB 75 ramp to EB West closed.

I-94:

Macomb – EB I-94, Stephens to 10 Mile, 1 left lane open, Fri 9p-Sat 3p; including ramps.

Macomb – WB I-94 ramp to M-59, ramp closed Thu 9p-Fri 5a AND Fri 9p-Mon 5a.

M-1: (Woodward)

Oakland – NB/SB M-1 CLOSED, MLK Blvd to Auburn Rd, Fri 9p-Sun 10a.

M-10: (Lodge)

Wayne – NB M-10 at I-75, 1 lane open, Fri 9a-Sat 5a.

Wayne – Bagley ramp to NB M-10, ramp closed Fri 9p-Sat 5a.

M-39: (Southfield Fwy)

Wayne – SB M-39 at M-5 (Grand River), right lane closed Sat 9a-3p.

M-8: (Davison)

Wayne – WB M-8 (Davison) service drive at M-1, service drive closed, Sat 6a-6p.

Old M-14: (Plymouth Rd)

Wayne – EB/WB Plymouth Rd at Middle Belt, one lane closed each dir, Sun 9a-3p.

Wayne – NB/SB Merriman at Plymouth, 1 lane open Sun 9a-3p.

 

US-24: (Telegraph)

Wayne – NB US-24 at Ford Rd, right lane closed Fri 9p-Mon 5a.

MONDAY:

I-75:

Wayne – NB I-75 service drive, I-96 to Springwells, 1 lane open, Mon 7a-Thu 5p.

M-10: (Lodge)

Wayne – SB M-10 at Fort St (M-85, left lane closed, Mon 7a-Mon 8/21.

M-19:

Macomb – NB/SB M-19 closed, Grand Trunk to Beech St, Mon 6a-Sun 7p.

M-5: (Grand River)

Wayne – EB M-5 (Grand River Ave) between Lahser and Burt: Right lane closed; three lanes remain open from Mon. 9 AM to Fri. 2 PM.

M-85: (Fort St)

Wayne – NB/SB M-85 over M-10, one lane open Mon 7a-Sat 5p.

 

Loading Disqus Comments ...
Loading Facebook Comments ...